Project request for Seccua Ultrafiltration

Project data

Project name:    
Last name: * Surname:
Fon: * Street:
Fax: Zip/ Post code:
E-Mail: * City: *

Please note that fields marked with an asterik (*) are mandatory.
This registration procedure is subject to data privacy rules and executed in compliance with regulations on the protection of personal data.

Step 1: Questions for the requirement calculation
Used consumption object Quantity
Shower (Shower rose DN 15)
Mixer tap Bathtub (DN 15)
Mixer tap wash basin (DN 15)
Mixer tap sink (DN 15)
Flushing valve (urinal)
Lavatory cistern
Dishwasher
Rinsing maschine
Outlet valve DN15
Outlet valve DN 20
Outlet valve DN 25
Outlet valve DN 25 (free run-out)
Facility type
Requirement specification
You need:
Peak load liter/second
Daily requirement
Step 2: Questions refering to the storage capacity
Storage capacity available
Size of the Tank (Capacity) liter
Type of storage  
Open, pressure-free tank
Elevated tank
Compressed air tank
only with compressed air tank:
switch on/off pressure
bar
Ultrafiltration must be installed before or after the buffer?
Please offer a suitable tank
Step 3: Type and of quantity of raw water?
The raw water, that must be filtered comes from:
City water
Spring water
Well water (Depth m)
Surface water
(Streamlet, river, lake)
Rainwater
Waterextraction throughput
min liter/sec.
max liter/sec
Trubidity increases after precipitation
Characteristics of the catchment area:  
Gravel plain
Karst or crevice rock
Humid meadow or swamp
River or streamlet nearby (up to 50 m distance)
The raw water indicates the following values:  
Trubidity FNU
Colour at 436 nm
Smell (qualitative)
Germs per 100 ml
Step 4: Questions refering to the pressure ratio
Filtration must be utilized by:  
natural primary pressure
Pressure increase through present pump
Pressure increase through a new pump
Pressure of the city water supply network
Current flow pressure at the installation point bar
If Pressure increases through current or planned pumps  
Pump type
Pump fabricator
Pump performance m3/h, at a Pressure increase of
  bar
  kW
Please offer a suitable Pump
The Ultrafiltration must be installed between pressure increase and the compressed air receiver
After leaving the Treatment (Ultrafiltration and tank if planed/ existant) the water must overcome the following resistance  
Elevation difference of m
Length of the conducts to the last attached intake (estimated) m
Diameter of the conducts (mm or DN)
Comments  

 

 

We´re eager to help you in finding a water treatment solution suitable to your needs!

Please answer the questionary on this page.

If available please send us additional documents (e.g. water analysis, schemes, drafts of the existant and planed supply system) by fax or e-mail to Seccua Technical Support:

Fax: +49 (0)8862 91172-19
E-Mail: info@seccua.com